nam-con-son-pipelineNam Con Son Gas pipeline came into operation in 2003 to transport natural gas from Blocks 06.1, 11.2 and 12W to Dinh Co Gas Processing Plant  (Nam Con Son Terminal) for processing. Dry gas from Nam Con Son Terminal is then transported in pipelines to Phu My Gas Distribution Center (GDC) for delivery to gas consumers.
The current maximum capacity of Nam Con Son gas system is 20 million m3 of gas per day.